563 Acres in Dallas, Texas

432 MW

34.5kV

27 MW

Data Center

CASE STUDY

Fort Spunky

On-Site Natural Gas Power Plant with Integrated Battery Energy Storage and Electrical Distribution

SITE OVERVIEW

Dallas, Texas remains a leading data center market due to its business-friendly policies and lack of state and local sales taxes. The Pacifico site, strategically located in Hood County, is as close to city center as can reasonably be achieved in a NAAQS attainment area. The site also offers abundant access to natural gas, water and fiber connectivity.

POWER

Co-located power plants have traditionally supported large industrial users in prime power, supplemental, and backup applications. Challenging grid conditions, modern technologies, and increased data center growth all now combine to open the door to on-site generation for data centers.

UNINTERRUPED DESIGN

Power availability starts at the source, which is why Pacifico Energy starts with

the right site, then adds the right design.


  • All siting includes dual, redundant gas supply lines – each able to cover 100% of the load


  • N+2 units installed, in addition to BESS support


  • Electrical distribution accounts for any outage of any generating unit


  • 3rd party report confirming 99.99X% availability for power delivery

DETAILS

Offtaker of Electricity

Data Center

Scale of Power Generation

432 MW

Location

563 Acres in Dallas, Texas

Battery Capacity

27 MW

Delivery of power to data centers

34.5kV

Status

Permitting

Other Case Studies

Explore more of our energy case studies from around the world, each one tailored to meet unique challenges and deliver measurable impact.

Electric Utility / Wholesale

30 MWdc

Food Manufacturing

5.5 MWdc

Community Solar

6.5 MWdc

Electric Utility / Wholesale

54.8 MWdc

Water & Wastewater Utility

11 MWdc

Data Center

432 MW

Let's Talk

What are your organization’s energy-saving objectives?

My Organization wants to...
panels-trees.jpg
Half-image-before.jpg
bottom of page